The technological flood of rebirth

Chapter 23: Spectacular scene

Views:

While Zhao Yi was busy with the software company, Wei Donglai, general manager of the environmental management company, called and said that all the graders were in place and asked Zhao Yi if he wanted to guide the work.

Originally, Zhao Yi didn't want to go. He still had a lot of unfinished things on hand. He swallowed the refusal as soon as he said it, because he found that he had never been there because he had been busy with things in the past few months. .

As the first company I established, it would be unreasonable not to go and take a look, and if I didn’t actually understand the situation, it would be bad if something happened.

After handing over the matters at hand, Zhao Yi took a plane to Yulin. To be honest, Zhao Yi actually wanted to get a private jet, but this area was not yet open in China, so he gave up.

Fortunately, Yulin has a Yulin Southern Suburban Airport. Otherwise, traveling there would be even more troublesome. Now it is much better, although it is also troublesome to buy air tickets.

When Zhao got off the plane, a strong wind rushed straight to the door. Zhao Yi smelled a smell of dust in the air, which showed how bad the environment here was.

"This environment is really bad. It's hard for you." Zhao Yi frowned and looked at the sky, then turned back and said to Wei Donglai.

"It's nothing to be embarrassed about. You're used to it. It may be your first time here, so it feels a little more obvious." Wei Donglai didn't dare to complain and said with a smile.

"Anyway, at least your hard work is still there for now. As for the credit, I have to see how you have completed your specific work." Zhao Yi said to Wei Donglai seriously.

When Wei Donglai heard this, he didn't dare to neglect, and said quickly: "Why don't you come over and take a look at the progress of the company's related work during this period, so that you can check it for us."

When Zhao heard this, he also knew that talking more would be useless and would only add pressure to the staff here. As long as the work could be completed as planned, he did not want the company's employees to be under high pressure all the time. Unlike the companies of later generations, he would not want to Let employees live in a tense atmosphere all the time, regard the company as their home, and bleed all their blood in the company.

"Okay, let's go to the curing agent factory as our first stop now." Zhao Yi said to Wei Donglai.

"Why don't you go to the hotel to rest first?" Wei Donglai suggested.

"No need, I'm not an old man yet, I still have some energy." Zhao Yi said with a smile.

"That's okay." When Wei Donglai heard this, he said no more and let Zhao Yi get into the company car.

I got on the Hongqi car and looked at the surrounding scenery. Although everything looked green, but if I looked carefully, I saw that the land under the trees was full of gravel. These greens were witnesses of the domestic people's fight against the wind and sand. If it weren't for Zhao Yishao's support, , the Mu Us Desert was also contained in later generations, and its desertification area continued to shrink, earning it the reputation of being a fortress in the south of the Yangtze River.

However, the participation of Zhao Yi can accelerate this process and completely solve the problem of land desertification. Although the trees have survived, the problem of land desertification has not been fundamentally solved. It only stopped the quicksand and prevented the further expansion of desertification.

In addition, Zhao Yi is unified, standardized and large-scale production, and can effectively use these lands. After the pastures and livestock factories are established later, they will bring considerable income to the area. Farmers and desert control workers in this area will work in Zhao Yi's agricultural and animal husbandry company, and they can also live a stable life.

Hongshixia Reservoir is located on the main stream of Yuxi River in Qiaotou Village, 5 kilometers north of YL City, SX Province. The reservoir area belongs to the sandy grassland and river source area, with an actual controlled area of 2,060 square kilometers.

In 1953, representatives from Yulin County attending the First People's Congress of SX Province proposed a proposal to build the Hongshixia Reservoir for flood control, city protection and farm irrigation, which was approved by the Congress. In 1954, Suiyu Water Conservancy Engineering Office conducted survey and design, and construction started on March 10, 1955. The main project was basically completed on June 11 of that year.

The sand-fixing agent factory needs to use a lot of water, so it is built next to the water source.

The car arrived at the Hongshixia Sand Fixing Agent Factory. When Zhao got out of the car, he saw a large group of buildings. Many of the buildings were still unfinished. There was also a one-kilometer runway inside the factory that was also under construction.

Seeing this, Zhao Yiyi said to Wei Donglai: "After leveling the sand, the curing agent will come in handy. You still have to hurry up."

"I know that we estimate that the construction time will be three months, and it will take about two months to complete our construction and equipment installation and debugging. Then we will leave half a month for production and debugging. After debugging, we can start production. ." Wei Donglai said.

After hearing what Wei Donglai said, Zhao Yi said nothing more. Knowing that what Wei Donglai said was basically consistent with the plan, he just walked around the factory area to take a look.

After seeing it almost, Zhao Yi followed Wei Donglai to the office. Although Zhao Yi was not here all year round, an office was still prepared for Zhao Yi.

Sitting on the office chair, Zhao Yi said to Wei Donglai: "You know, we are an environmental management company. Although we are currently helping agricultural and animal husbandry companies manage the Mu Us Desert, the company still needs to start to understand the domestic situation and work on sewage treatment and fixation. We will work hard on garbage disposal and saline-alkali land environmental management.”

Hearing Zhao Yi's words, Wei Donglai nodded and said: "These are all in our follow-up plans, but the current desert environment treatment project is too large and there are currently not enough manpower to conduct research on other businesses."

Zhao Yi also knows that in the current domestic employment environment, it is difficult to recruit people, and it is even more difficult to recruit highly technical personnel. Although I have the technology, I still need highly skilled personnel to operate and implement it, so I would like to remind you.

"I know that too, but I still hope you can do the relevant work first and then improve it slowly." Zhao Yi said.

"I understand, we will start working on this matter after we finish the construction of the sand-fixing agent factory." Wei Donglai said quickly.

"Well, how is the construction of the fertilized grass seed factory going?" Zhao Yi asked.

"We have found a place and are now building greenhouses. The preparatory work for breeding is being carried out in the greenhouses that have been erected. When the entire greenhouse construction is completed, comprehensive breeding work will begin." Wei Donglai said.

"The task is very heavy. We have to cooperate with the agricultural and animal husbandry company in cultivating forage seeds. We need to speed up the pace." Zhao Yi thought about it in his mind and said.

"We will continue to work hard and ensure that the overall plan will not be delayed." Wei Donglai assured.

After hearing Wei Donglai's words, Zhao Yi encouraged him a few words.

According to the steps of the desert management plan, the first stage is to level the desert to facilitate future mechanized operations; the second stage is to use sand-fixing agents. Sand-fixing agents can not only prevent the flow of sand dunes, but also have a moisturizing effect and can fertilize grass seeds. A certain level of fertility allows the loam grass to germinate and grow smoothly; the third stage is to wait until the loam grass dies and rots and the soil is fertile enough to start sowing grass seeds.

The next day, Zhao Yi followed Wei Donglai to a gathering point in the desert. Because the desert was very large, Zhao Yi planned to divide the desert into sections of 1,000 square kilometers, and set up a gathering point in each area. Provide personnel to stay permanently. After desertification control is completed, the gathering points will become the locations of livestock factories and other facilities. Highways will be built between these areas to connect all areas to facilitate future product transportation.

Zhao Yi inspected the situation at the gathering point. Many facilities are currently constructed on a temporary basis. For example, employee dormitories are prefabricated houses, diesel engines are still used to generate electricity, and domestic water is still pulled by trucks. Fortunately, it does not affect the lives of employees, and Zhao Yi no longer makes too many demands.

At 8 o'clock in the morning, the temperature was around ten degrees, not very hot, and the wind was breezy. If you ignored the smell of dust in the air, everything was actually fine.

Hundreds of graders were spread out in a row, which was very spectacular. As Zhao Yi came to the stage and finished his brief speech, with an order, the graders started one after another and drove towards the outside of the gathering point. Suddenly, yellow sand rolled and covered the sky. day.

If you can overlook it from the air, the entire desert seems to come alive. Yellow sand floats up from each gathering point, spreads from all sides, and then joins together. It is very spectacular.

This kind of work will take three months and is scheduled to be completed by February 1980. (End of chapter)